Skip bin sizes & prices

From 3m³ midi skips for household tidy-ups to 8m³ mega skips for major renovations. Your price depends on the size and the type of waste — pick the combination that suits your job.

3m³
Midi Skip

Approx. 1.3m x 1.8m x 1.2m

from$375

Price varies by waste type — see full pricing below.

Best for

  • Household clear-outs
  • Small renovations
  • Deceased estates
4m³
Standard Skip

Approx. 1.5m x 2.4m x 1.2m

from$450

Price varies by waste type — see full pricing below.

Best for

  • Bathroom renovations
  • Moving house
  • Medium cleanouts
6m³
Large Skip

Approx. 1.6m x 3.5m x 1.4m

from$600

Price varies by waste type — see full pricing below.

Best for

  • Kitchen renovations
  • Large cleanouts
  • Small building jobs
8m³
Mega Skip

Approx. 1.8m x 4.0m x 1.5m

from$700

Price varies by waste type — see full pricing below.

Best for

  • Construction sites
  • Major renovations
  • Large demolitions

Pricing by bin size & waste type

Cleaner loads such as concrete or soil cost less; heavy soil and renovation loads cost more. All prices include GST, delivery, 7-day hire, pickup and responsible disposal.

No soil or concrete in bins over 3m³ — extra charges will apply if found in bin.

Concrete / soil

Clean concrete or clean soil only — one material, no mixing

3m³$375

No soil or concrete in bins over 3m³ — extra charges will apply if found in bin.

Green waste (no soil)

Branches, prunings, grass clippings, leaves

3m³$375
4m³$450
6m³$600
8m³$700

General junk & household

Furniture, white goods, boxes, general rubbish (mattresses at extra fee)

3m³$475
4m³$575
6m³$815
8m³$925

New construction waste

Offcuts, timber, plasterboard and packaging from new builds

3m³$475
4m³$575
6m³$815
8m³$925

Renovation materials

Mixed renovation strip-out — timber, plasterboard, tiles, bricks, fittings

3m³$620
4m³$750
6m³$1,055
8m³$1,175

Mixed waste with soil

Soil, dirt, green waste, concrete, bricks and tiles in mixed loads

3m³$620
4m³$750

Extended hire available at $25 per day. Excess weight and restricted materials charged per our schedule.